Tile, Vanities, and Stuff
Before the marble floor could be installed in the Master Bath, the heated sub-floor needed to be installed.
Now the marble flooring can go in.
Finally, the vanity is installed. The template(s) for the Ice Stone countertop(s) will be made on Friday.
The tile is also being installed in the Guest Bath.
Here's a shot of the Guest Bath vanity.
After what seemed like weeks of waiting, the last of the stone order finally arrived. Now, if it would only stop raining :-(
The Breakfast Area is coming along nicely.
The custom moulding for the inside of the front door arrived and was installed.