Tile, Vanities, and Stuff


Heated Master Bath Floor


Before the marble floor could be installed in the Master Bath, the heated sub-floor needed to be installed.




Master Batch Marble


Now the marble flooring can go in.





Master Bath Vanity


Finally, the vanity is installed. The template(s) for the Ice Stone countertop(s) will be made on Friday.




Guest Bath Tile


The tile is also being installed in the Guest Bath.




Guest Bath Vanity


Here's a shot of the Guest Bath vanity.




Boxes of Stone


After what seemed like weeks of waiting, the last of the stone order finally arrived. Now, if it would only stop raining :-(





Breakfast Area


The Breakfast Area is coming along nicely.




Front Door Moulding


The custom moulding for the inside of the front door arrived and was installed.




<<==Prev Next ==>>